Do You Need A Permit To Replace A Roof In Massachusetts?

Yes. Replacing a roof in Massachusetts takes a building permit from your town, and your contractor is the one who should pull it. Here's what the state code says, what the permit costs, and where to find the building office in Tewksbury and the eleven towns around it.

Senco roofer carrying a bundle of shingles up an asphalt shingle roof from the ladder

Does A Roof Replacement Need A Permit?

Yes. The Massachusetts State Building Code (780 CMR) says nobody can construct, alter, repair, or remove part of a building without first getting a permit from the local building official. The code then lists the small jobs that are exempt: a fence up to seven feet, a shed up to 200 square feet, painting, countertops, and a handful of others. Roofing isn't on that list.

The state's own guidance chart for contractors says the same thing in one row. Roofing, new or replacement, needs a building permit, a licensed construction supervisor, and a registered home improvement contractor.

The code in force is the tenth edition. It took effect on October 11, 2024, and since July 1, 2025 it has been the only edition a town can issue a permit under.

Does a roof repair need a permit?

That depends on the size of the repair. The code exempts what it calls ordinary repairs and leaves the call to the building official. Tewksbury's building department, for one, says replacing a few shingles is an ordinary repair and needs no permit. The state's chart marks minor roof repairs as a maybe. When a repair goes past a handful of shingles, one call to your building department settles it.

When a roof is leaking and can't wait, the code lets emergency repairs start right away, with the permit application filed the next business day.

Who Pulls The Permit?

Your contractor does. Massachusetts law (General Laws chapter 142A, section 2) requires a home improvement contract to tell you three things: which permits the job needs, that getting them is the contractor's obligation, and that a homeowner who secures their own permit is excluded from the state's Guaranty Fund.

That fund is why this matters. It pays a homeowner up to $25,000 when a registered contractor does bad work, loses in court or arbitration, and doesn't pay. Under the state's rules, an owner who pulled their own building permit for the job generally can't collect from it.

The code does let the owner of a one- or two-family home pull a permit and do the work without a license. If you then hire someone else to do it, you're the supervisor of record. So when a roofer asks you to pull the permit yourself, ask why.

What the building department asks for

The paperwork is close to the same in every town:

  • The contractor's Construction Supervisor License and Home Improvement Contractor registration
  • A workers' compensation affidavit. State law tells towns to hold a permit until the applicant shows proof of coverage.
  • A debris form naming the licensed facility where the old roof is going. State law makes that a condition of the permit.
  • A copy of the signed contract, in many towns
  • The cost of the job, which sets the fee

Our guide to the licenses a Massachusetts roofer needs shows how to look both numbers up before you sign.

What A Roof Permit Costs, And How Long It Takes

Each town sets its own fee. All twelve towns on this page price the permit off the cost of the job, at $10 to $15 for each $1,000, with minimums from $25 to $150. On a $12,000 roof, that works out to somewhere around $150 to $250 depending on the town. Ask whether the permit fee is included in your quote.

On timing, the state gives a building official 30 days to issue or deny a complete application. That's the outer limit. Wilmington's building office says that under normal conditions it reviews applications within a week or so.

After the permit is issued, it stays posted at the house until the job is done, and the work has to start within 180 days. The building official tells the contractor which inspections the job needs when the permit goes out, and a final inspection closes it.

What happens without a permit

Towns charge more after the fact. Tewksbury, Andover, Dracut, North Andover, and Reading double the fee for work that starts without a permit. Lowell and Methuen charge triple. Past the fee, state law allows a fine of up to $1,000 for each building code violation, and a licensed supervisor can have their license suspended for working without a permit.

What The Code Asks Of A New Roof

A permit means the job gets built to the state code and someone from the town can check it. For a roof on a house, these are the rules that come up on nearly every job:

  • A replacement is a tear-off. The code defines a roof replacement as removing the existing roof covering down to the deck, repairing any damaged decking, and installing a new roof covering.
  • Two layers is the limit. New shingles can't go over a roof that already has two or more layers, over roofing that's water-soaked or too far gone to serve as a base, or over slate, clay, cement, or asbestos-cement tile.
  • Ice barrier at the eaves. Massachusetts requires an ice barrier under asphalt shingles, running from the lowest edge of the roof to at least 24 inches inside the exterior wall line.
  • Insulation, sometimes. Reroofing has to meet the energy chapter of the code. When a tear-off exposes the sheathing on a roof with no insulation in the cavity below it, the code calls for insulation above or below the sheathing.

Our guides to how long a roof lasts and what causes ice dams go further into the layer rule and the eaves.

Building Departments, Town By Town

We checked each of these against the town's own website on November 28, 2026. Fee schedules and office hours change, so confirm with the office before you count on a number.

Tewksbury

  • Office: Tewksbury building department, 1009 Main Street, lower level. 978-640-4430.
  • Apply: Online through the town's permit portal. There are kiosks for it on the lower level of Town Hall.
  • Fee: The town's posted schedule lists roofs at a $30 minimum plus $10 per $1,000 of job value. It's dated February 2011, so confirm it. Work without a permit is double.
  • Worth knowing: The roofing checklist asks for the contractor's license and registration, a workers' comp affidavit, liability insurance, a copy of the contract, and a trash disposal form. The town says replacing a few shingles is an ordinary repair that needs no permit.
  • From Senco: Roof replacement in Tewksbury

Billerica

  • Office: Billerica building department, Town Hall, 365 Boston Road, Room G2. 978-671-0959.
  • Apply: Online through the town's permitting portal.
  • Fee: $12 per $1,000 of estimated cost, with a $40 residential minimum (approved December 2023). A $30 processing fee is paid with the application and counts toward the total.
  • Worth knowing: Billerica has four historic districts: the Center, North Billerica Mills, the Corner, and Richardson's Mill. The Historic Districts Commission reviews exterior changes there before a permit is issued, and its bylaw doesn't exempt the color of roofing.
  • From Senco: Roof replacement in Billerica

Chelmsford

  • Office: Chelmsford building department, Town Offices, 50 Billerica Road. 978-250-5225.
  • Apply: Online through Permit Eyes. The town's Residential Short application covers roofing with no structural change.
  • Fee: $150 minimum, plus $15 per $1,000 of cost above $10,000.
  • Worth knowing: A dumpster larger than 6 cubic yards needs a Fire Department permit, $25 for six months.
  • From Senco: Roof replacement in Chelmsford

Andover

  • Office: Andover building department, Building Division, 36 Bartlet Street. 978-623-8620.
  • Apply: Online through the town's permit portal.
  • Fee: $25 application fee plus $13 per $1,000 of construction cost (effective January 2024). Work without a permit is double.
  • Worth knowing: Since May 2026 the town prints the permit card, and the contractor has to pick it up before starting. If the card isn't at the house, the inspection fails. Homes in the Ballardvale and Central Street historic districts answer to their own commissions, and a dumpster over 6 cubic yards that stays more than a day needs Board of Health and Fire permits.
  • From Senco: Roof replacement in Andover

Lowell

  • Office: Lowell building department, Development Services, City Hall, 375 Merrimack Street, 2nd floor. 978-674-4144.
  • Apply: Call first. The city lists roofing among the permits it takes online, and a new applicant needs an ID from the office before using the site.
  • Fee: $50 for the first $1,000 of cost and $10 for each $1,000 after that, plus a $75 certificate of completion. Work without a permit is triple.
  • Worth knowing: Lowell names roofing on its list of work that needs a permit, and its application has a box for strip and reroof. A dumpster in the street needs a $50 permit from the City Engineer, and construction debris can't go out with the trash.
  • From Senco: Roof replacement in Lowell

Wilmington

  • Office: Wilmington building department, Town Hall, 146 Middlesex Avenue, Room 202. 978-658-4531.
  • Apply: On paper, in person. The town posts the forms to download.
  • Fee: $50 for the first $1,000 of work and $10 for each $1,000 after that.
  • Worth knowing: The town says it reviews applications within a week or so under normal conditions. It wants a copy of the license, liability insurance, and a workers' comp affidavit, plus either a no-asbestos document or a state asbestos notification with the package.
  • From Senco: Roof replacement in Wilmington

Burlington

  • Office: Burlington building department, Town Hall Annex, 25 Center Street. 781-270-1615.
  • Apply: Online. The residential short form covers replacement roofing.
  • Fee: $13 per $1,000, with a $50 minimum (schedule dated August 2026).
  • Worth knowing: The permit card has to be printed and at the house to get an inspection. Construction hours are 7 to 7 on weekdays and 9 to 7 on Saturdays, with no construction on Sundays.
  • From Senco: Roof replacement in Burlington

Dracut

  • Office: Dracut building department, Town Hall, 62 Arlington Street. 978-454-0603.
  • Apply: Online through the town's permit portal.
  • Fee: $12 per $1,000, with a $50 minimum (effective July 2023). Work started before the permit is double.
  • Worth knowing: The town bases the fee on the contract amount plus any change orders.
  • From Senco: Roof replacement in Dracut

Methuen

  • Office: Methuen building department, Inspections Division, Searles Building, 41 Pleasant Street, Suite 203. 978-983-8625.
  • Apply: Online through the city's permit portal.
  • Fee: $13 per $1,000 of construction value, with a $50 minimum (approved August 2022). Work without a permit is triple.
  • Worth knowing: In the Searles Tenney Nevins Historic District, the commission's rules say to keep original roofing or replace it in kind, and exterior work needs its certificate first. A dumpster of 6 cubic yards or more needs a Board of Health permit.
  • From Senco: Roof replacement in Methuen

North Andover

  • Office: North Andover building department, 120 Main Street. 978-688-9545.
  • Apply: Online through the town's permit portal. Inspections are requested by phone.
  • Fee: The schedule the town links is dated 2006 ($12 per $1,000, $30 minimum), so ask the office for the current figure. The fee doubles if work starts first.
  • Worth knowing: In the Old Center Historic District, the commission reviews exterior changes that can be seen from a public way.
  • From Senco: Roof replacement in North Andover

North Reading

  • Office: North Reading building department, 235 North Street. 978-357-5240.
  • Apply: Online through Permit Eyes.
  • Fee: $13 per $1,000 of construction cost, with roofing named on the schedule and a $75 minimum (revised November 2024).
  • Worth knowing: The town asks for the contractor's license and a liability insurance certificate that names the Town of North Reading as holder. The Center Village Historic District covers nine buildings in the old center.
  • From Senco: Roof replacement in North Reading

Reading

  • Office: Reading building department, Town Hall, 16 Lowell Street. 781-942-6613. Town Hall is closed on Fridays.
  • Apply: Online through the town's permit portal.
  • Fee: $13 per $1,000 of construction value, with a $50 minimum (effective August 2024). The fee doubles if work starts before the permit is issued and posted.
  • Worth knowing: Reading asks for shingles rated for winds of 110 miles an hour or more and the number of squares in the work description. In its historic districts, roofing is on the list of work the commission reviews, and the building inspector can't issue a permit without its certificate.
  • From Senco: Roof replacement in Reading

We replace roofs in all twelve of these towns. What a replacement includes is on our roof replacement page, and a free roof quote gives you the job cost the permit fee is based on.

Pricing a new roof?

4.8★ · 82 Google Reviews  ·  48-hour response on repair calls  ·  Free, no-obligation. We reply within 24 hours.

Roof permit questions we hear a lot

Do I need a permit to replace my roof in Tewksbury, MA?

Yes. A roof replacement in Tewksbury needs a building permit from the Building Department at 1009 Main Street (978-640-4430). The town's posted fee schedule lists roofs at a $30 minimum plus $10 per $1,000 of job value. According to the town, replacing a few shingles is an ordinary repair and doesn't need a permit.

Do I need a permit to replace a roof in Massachusetts?

Yes. The state building code (780 CMR) requires a permit to alter or repair a building, and roofing isn't among the exempt jobs. Your town's building department issues it. The exception is a small job the building official treats as an ordinary repair, such as replacing a few shingles.

Who pulls the permit for a new roof, the homeowner or the contractor?

The contractor. Under Massachusetts General Laws chapter 142A, the contract has to say that obtaining permits is the contractor's obligation. A homeowner can legally pull their own, but an owner who does is generally excluded from the state's Guaranty Fund, which pays up to $25,000 on an unpaid judgment against a registered contractor.

How much does a roofing permit cost in Massachusetts?

Each town sets its own fee. The twelve towns around Tewksbury charge $10 to $15 per $1,000 of job cost, with minimums from $25 to $150, so the permit on a $12,000 roof runs roughly $150 to $250.

What happens if a roof is replaced without a permit in Massachusetts?

Most towns double the permit fee for work started without one, and some charge triple. State law also allows a fine of up to $1,000 for each building code violation, and a licensed construction supervisor can have their license suspended for working without a permit.